Fire fighting and prevention design approval
- Appraisal and approval of designs on fire prevention and fighting mean a competent agency's examination and comparison of solutions and design contents of projects, works, and motor vehicles with special requirements on assurance of fire safety with regulations, standards, provisions of the law of Vietnam related to fire prevention or fighting or foreign standards, international standards on fire fighting and prevention are allowed to be applied in Vietnam according to the order and procedures prescribed by law.
- Appraisal of fire fighting and prevention design is one of the jobs that are required for establishments, according to Decree 136/2020-ND-CP. The assessment and approval of the fire prevention and fighting design must be performed by a qualified design consultant and legal entity and then approved and accepted by the Fire Fighting and Prevention Police.
- The appraisal and approval of fire fighting and prevention, project file and designs, projects, works or work items when building new, changing the nature of use, must have the design of fire prevention and fighting as a competent agency. Planned must be approved for fire protection before construction. The result of design appraisal of fire fighting and prevention is one of the bases for reviewing, approving regulations, approving projects, appraising construction designs and granting construction permits.
PROCEDURES FOR REQUESTING APPROVAL OF FIRE FIGHTING AND PREVENTION
PROCEDURES FOR IMPLEMENTATION OF FIRE FIGHTING & PREVENTION DESIGN APPROVAL
Applying for fire fighting and prevention design approval consultancy is as simple as applying for a house construction permit.
The specific process is as follows:
Procedures for approval of a fire fighting and prevention project
- Planning fire fighting and prevention design project: No more than 10 working days.
- Basic design: No more than 10 working days for projects of group A. No more than 05 working days for projects of groups B and C.
- Technical design or construction drawing design: No more than 15 working days for projects of group A. No more than 10 working days for projects of groups B and C.
- Approval of construction site: No more than 05 working days. The grouping of projects and works of groups A, B and C mentioned above shall comply with the Government's regulations on the management of construction investment projects.